Seagull Models Super chipmunk Size 55 Specifications Page 5

  • Download
  • Add to my manuals
  • Print
  • Page
    / 28
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 4
5
www.seagullmodels.com
8) After both ailerons are securely hinged,
firmly grasp the wing panel and aileron to
make sure the hinges are securely glued and
cannot be pulled out. Do this by carefully
applying medium pressure, trying to separate
the aileron from the wing panel. Use caution
not to crush the wing structure.
7) Repeat this process with the other wing
panel, securely hinging the aileron in place.
6) Using C/A remover/debonder and a
paper towel, remove any excess C/A glue that
may have accumulated on the wing or in the
aileron hinge area.
5) Turn the wing panel over and deflect the
aileron in the opposite direction from the
opposite side. Apply thin C/A glue to each
hinge, making sure that the C/A penetrates into
both the aileron and wing panel.
Work the aileron up and down several
times to “work in” the hinges and
check for proper movement.
Note:
Aileron control horn.
INSTALL THE AILERONS CONTROL
HORN.
1) Locate the hardware necessary to install
the control horns for the ailerons.
HINGING THE ELEVATOR.
Glue the rudder hinges in place using the
same techniques used to hinge the ailerons.
Fiberglass control horn.
2)Position the Control horn on the Aileron
and use 30-minute Epoxy
Epoxy.
Page view 4
1 2 3 4 5 6 7 8 9 10 ... 27 28

Comments to this Manuals

No comments